Pipeline design and installation should be considered from the customer's standpoint
Visit:4386 Date:2019-07-11
With the development of the times, the industrial assembly line machinery and equipment have been widely used, and the application is extensive. Of course, the layout planning of the assembly line is also an appropriate and important part. The design engineers of the design assembly line should according to the customer's factory environment, the size of the site and the items to be transported. The size of the volume and the production process skills to design the appropriate conveyor belt equipment, the layout of the belt assembly line plan needs to pay attention to the following:
1. At the time of installation, pay attention to the area occupied by the assembly line. It is necessary to install according to the size of the factory area. Save the place to the end. On the one hand, it is necessary to consider the saving of the floor space, on the other hand, the comfort of the staff. This is also a way to improve work efficiency.
2. But when a worker takes care of multiple devices, think about keeping workers moving as short as possible.
3. When the assembly line is in the device, it is best not to use the device too long, because it is so inconvenient to manage the staff, and the length of the wire used is long. This is also simple and ruin. Moreover, if the quality of the wires used is not good, it is also a kind of damage to the machine.
4. When the assembly line is installed, the working place should be placed in accordance with the technical road. When there are two or more working places in the process, consider how to place the work in the same process. Usually when there are two or more even-numbered similar operations, consider using two-column placement and classifying them in two cases on the road.